Wall and communal well
The works of cleaning carried out
in the site in October of 2002 have put in the open
more than 30 meters of the wall and the communal
well of the town in the sector NW, near the current
entrance.
The wall, probably begun in this
sector to protect the well, seems that never was
ended.
The well, with a mouth of 10 meters
of diameter and about 6 meters of deep is also
probable that never was operative, or perhaps it was
closed up by the existent brashes in the
bottom.
|